Non-Technical Loss Analysis Based on kWh Meter Maintenance Aspects at PT. PLN (Persero) UP3 Situbondo

Authors

  • Rizka Danny Kireinawati Universitas Pembangunan Panca Budi
  • Rahmaniar Universitas Pembangunan Panca Budi
  • Hamdani Universitas Pembangunan Panca Budi

Keywords:

kWh Meter Disturbances, Non-Technical Losses, Impact of kWh Meter Replacement.

Abstract

During the process of electricity distribution, there is a loss of electrical energy that comes from the difference between the amount of energy produced and the amount sold. This is referred to as losses. Losses are classified into two types: technical losses and non-technical losses. Non-technical losses represent the loss of electrical energy due to unmeasured energy caused by disturbances in measuring instruments (kWh meters). These disturbances may include aged kWh meters, blurry meters, damaged or broken meter covers, blank LCD displays, non-rotating meter disks, and burned or lightning-struck meter terminals. This study employs both qualitative and quantitative methods. The collected data consists of the realization of kWh meter replacements experiencing disturbances from January to June 2024. Based on these data, the total percentage of non-technical losses experienced by PLN Situbondo is 0.65%. Meanwhile, the percentage contribution of kWh meter disturbances to non-technical losses is 0.0076%. During the disturbance period, electricity consumption was recorded at 244,871 kWh. However, after the kWh meter repairs, consumption increased to 274,648 kWh. Therefore, the improvement in losses reached 29,777 kWh, equivalent to Rp 20,758,691. Other benefits include improved operational efficiency for PLN and increased accuracy in customers’ electricity billing readings. This minimizes meter reading errors. Thus, replacing kWh meters is an effective way to reduce such losses.

References

S. Andaresta, A. Prof, I. Hermansyah, S. Kom, and D. Ph, ‘ANALISIS GANGGUAN PADA KWH METER DI PT PLN ( PERSERO ) ULP TALUK KUANTAN DENGAN METODE FAULT TREE ANALYSIS ( FTA ) ANALISIS GANGGUAN PADA KWH METER DI PT PLN ( PERSERO ) ULP TALUK KUANTAN DENGAN METODE FAULT TREE ANALYSIS ( FTA )’.

T. T. Seno, N. M. F. A. Putri, and H. E. Patoding, ‘Analisa Gangguan Teknis Pada Kwh Meter Prabayar 1 Phasa Guna Menjaga Kualitas Pelayanan Pelanggan di PT PLN (PERSERO) ULP Jayapura’, Nucleus, vol. 5, no. 02, pp. 212–222, 2024, doi: 10.37010/nuc.v5i02.1874.

N. M. Tanjung, A. Yuana, D. Rachman, and A. Syofian, ‘Analisa Perhitungan Susut di PT PLN ( Persero ) ULP Talang Padang’, vol. 5, pp. 355–370, 2025.

S. Syukri, M. Muliadi, and A. Akbar, ‘Analisa Perhitungan Susut Teknis Di Pt. Pln (Persero) Rayon Singkil’, Elektrika, vol. 16, no. 1, p. 20, 2024, doi: 10.26623/elektrika.v16i1.8854.

Adekayanti Yuniar, Adiasa Iksan, and Mashabai Ismi, ‘Analisis Gangguan Pada Kwh Meter Pelanggan Di Pt. Pln (Persero) Up3 Sumbawa Menggunakan Fishbone Dan Pdca (Plan, Do, Check, Action)’, jurnal Industri & Teknologi Samawa, vol. 2, no. 1, pp. 22–31, 2021.

A. Pranata, ‘Fakultas teknik universitas tridinanti palembang 2020’, Muhammad Agus Mauladi, vol. 2019, 2020, [Online]. Available: http://repository.univ-tridinanti.ac.id/id/eprint/756%0Ahttp://repository.univ-tridinanti.ac.id/756/6/Bab I - Pendahuluan.pdf

S. Sugianto and P. Untara, ‘Studi Susut Energi Pada Sistem Distribusi Tenaga Listrik Melalui Analisis Pengukuran Dan Perhitungan’, Sinusoida, vol. 21, no. 2, pp. 39–56, 2019, doi: 10.37277/s.v21i2.686.

Salahuddin, ‘Perbandingan energi listrik kwh prabayar dengan pascabayar 1’, Jurnal Energi Elektrik, vol. 5, no. 2, pp. 11–20, 2016.

K. P. Widiatmika, Penurunan Susut Non Teknis pada Jaringan Distribusi menggunakan Sistem Automatic Meter Reading di PT. PLN (Persero) , Etika Jurnalisme Pada Koran Kuning : Sebuah Studi Mengenai Koran Lampu Hijau, vol. 16, no. 2, pp. 39–55, 2015.

R. W. Pratama, ‘UPAYA PENURUNAN SUSUT NON TEKNIS DENGAN PEMELIHARAAN KWH METER MACET DI PT. PLN (PERSERO) ULP PAMEKASAN’, Pamekasan, 2023.

M. F. Ikanov and M. Haddin, ‘Perhitungan Susut Energi Pada Pemeliharaan APP Prabayar dan Pascabayar di PT PLN (Persero) ULP Anambas’, Jupiter (Jurnal Pendidikan Teknik Elektro), vol. 9, no. 2, p. 56, 2024, doi: 10.25273/jupiter.v9i2.20906.

A. H. Fadhilah, ‘Susut Non Teknis Pada Kwh Meter 1 Phasa Di PT. PLN ULP Brebes’, Jurnal Ilmiah Wahana Pendidikan, Juli, vol. 9, no. 14, pp. 78–84, 2023, [Online]. Available: https://doi.org/10.5281/zenodo.8170416

V. Issue and K. Kunci, ‘JUTIN : Jurnal Teknik Industri Terintegrasi Studi Analisa Susut Energi Listrik Non Teknis dengan Cara Optimalisasi Peremajaan Kwh Meter Pascabayar 1 Phasa Di PT . PLN ( Persero ) ULP Painan’, vol. 6, no. 1, 2023, doi: 10.31004/jutin.v6i1.18022.

F. Surusa, Q. Aini, A. I. Pratiwi, and Y. Mohamad, ‘Analisis Susut Non Teknis Akibat Gangguan pada kWh Meter PT. PLN UP3 Gorontalo’, Jambura Journal of Electrical and Electronics Engineering, vol. 6, no. 1, pp. 32–38, 2024, doi: 10.37905/jjeee.v6i1.22380.

M. Wozali, U. Usman, and P. Purwito, ‘Analisis Susut Energi Listrik Non Teknis Pada Kwh Meter Prabayar Di PT PLN (Persero) Unit Layanan Pelanggan (ULP) Palopo Kota’, Jurnal Teknologi Elekterika, vol. 20, no. 2, p. 80, 2023, doi: 10.31963/elekterika.v20i2.4514.

Downloads

Published

2025-10-27

Most read articles by the same author(s)

1 2 > >>